lessphp fatal error: load error: failed to find /services3/g/s/gsengineering.ro/public/wp-content/themes/theme48188/bootstrap/less/bootstrap.lesslessphp fatal error: load error: failed to find /services3/g/s/gsengineering.ro/public/wp-content/themes/theme48188/style.less SATU MARE: WATER–SEWAGE SURVEY

SATU MARE: WATER–SEWAGE SURVEY

Our team participated in the execution of the following services:

On-site works:

  • Identifications of streets and working sites by following the plans received from the engineering design company;
  • Execution of the geodetic network for referencing the surveyed data to the projection system STEREO 1970;
  • Stake-out of the boundary points and planting landmarks;
  • Topographic surveys with GNSS equipment – approx. 160 km in the following localities of Satu Mare county: Craidorolt, Criseni, Decebal, Sanislau, Lipau, Bocicau, Tamaseni, Valea Seaca, Tarna Mare, Petea, Batarci, Negresti Oas, Tarsolt, Carmazana, Ardud, Micula, Tasnad, Orasul Nou, Odoreu – Berindan;
  • Video records of the streets we did the topographic surveying works;
  • Identification and making photos of the manholes for pipelines connection;

Office works:

  • Preliminary process of the on-site surveying data in parallel with on-site topographic surveys; thus we could rapidly correct/ clarify the information on the survey plan or collect additional required data;
  • Complete processing of on-site surveying data into the following deliveries:
      • Technical Report;
      • GPS Data Processing Report;;
      • Raw survey data;
      • Coordinates inventory;
      • Descriptions of the planted landmarks and the respective pictures;
      • Area Location Plan at 1:10 000 scale;
      • Location and Boundary Plan at 1:1 000 scale;
      • Video records of the streets we did the topographic surveying works;
      • Photos of pipelines connection manholes;

Project Management:

  • Building and maintaining a good working relationship both with the main beneficiary and the other public institutions involved (Satu Mare C.L.R.O., , mayors in Satu Mare county);
  • Weekly reports to the engineering design company of the on-site and office work progress, partial deliveries as soon as localities were completed;
  • Approving all the location and boundary plans with the local mayor offices where the water and sewage infrastructure is going to be build;
  • Submission and getting the tehnical reception on six cadastral documentations (for 6 of the communas where the works had been executed).